BeMo Project Online and BeMo website Scheduled Maintenance Jan. 28, 2013: 1AM-5AM PST

BeMo will be performing upgrades on its infrastructure and will be enhancing your user control panel with new features. These upgrades will be applied during the following maintenance scheduled on: January 28, 2013 between 1:00 AM and 5:00 AM PST (UTC-8).

Impact:

During this period BeMo Project Online 2010 (pwa.bemopro.com) , BeMo Project Online 2013 (pwa13.bemopro.com ) and BeMo website (www.bemopro.com) including access to our Control Panel will be interrupted multiple times for short periods.

Upgrades will include:

  • Addition of FluentPro EPM Pulse and FluentPro TimeTracker to our list of 3rd party add-ons available on-demand with BeMo Project Online
  • Publication of additional DB connection strings for SSRS
  • Usability and content fixes in user control panel
  • Maintenance on servers

Note to existing dedicated server customers: Access to your Project Server instance will not be impacted by this maintenance.

We can appreciate that the maintenance may not be convenient for everyone, but it is being performed in the interest of continuing to provide you with the best possible experience.

Thank you for your understanding.

The BeMo Team http://www.bemopro.comsupport.bemopro.com – support@bemopro.com P: +1 702 529 0820

This entry was posted in Misc.. Bookmark the permalink.

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s