Scheduled Maintenance – March 5 – 10PM PST

Dear BeMo user,

We would like to notify you about the following scheduled maintenance.

When:
Start Time: March 5, 2011 – 10:00 PM PST (Pacific Time, UTC/GMT-8)
End Time: March 6, 2011 – 3:00 AM PST (Pacific Time, UTC/GMT-8)

Main Purpose:
SoftLayer Engineers will be performing maintenance on MBR01.DAL01 (Master Backend Router) in a continued effort to maintain router functionality, performance, and add additional feature sets. During this maintenance, Engineers will be augmenting the current MBR01.DAL01 router with a redundant pair. This maintenance is scheduled to start at 12:00 AM CST until 5:00 AM CST on March 6th, 2011 (3/6/2011). While no BCR routers on the private network are scheduled for maintenance, they will be directly impacted by this maintenance as private connectivity between BCR routers will be lost.

Impact: During this period PWA services and BeMo website www.bemopro.com will be interrupted.

We can appreciate that the maintenance may not be convenient for everyone, but it is being performed in the interest of continuing to provide you with the best possible experience.

Thank you for your understanding.

The BeMo Team

www.bemopro.com
techsupport@bemopro.com

Phone: +1 702 529 0820
Copyright © 2011 BeMo LLC. All Rights Reserved.

This entry was posted in Misc.. Bookmark the permalink.

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s